top of page
PRESENTATIONS
Latest update on NEMAS
NEMAS is Net Energy Metering Assessment Study. The study will determine the technical impact to the Distribution Licensee’s electricity distribution network and establish technical and safety requirements that may be necessary for the installation. The requirements are explained in detail from document below:
Latest update on SARE
Supply Agreement with Renewable Energy (SARE) is a tripartite contract between building owner, solar investor and Tenaga Nasional Berhad. Access the details on the process flow of applying SARE and overview of the contract from the document below:
bottom of page